Services
Technical work on Docebo, defined by its scope. Every engagement starts from a written proposal stating what is included, what is out of scope, and the exit criterion of each phase — the proposal template is published.
Docebo Connect & Workato integrations
Recipes that keep running after we leave: designed around the five-step skeleton every Docebo Connect recipe shares, tested with fixtures, and documented for the person who inherits them.
What is in scope
- Recipe design and build — User Sync, Calendar Sync, Badge Issuance, Content Sync and the custom flows in between
- Connector and connection inventory: off-the-shelf vs community connectors, OAuth scoping, credential register
- Data Tables vs Lookup Tables — failed-record queues, deduplication trackers, audit trails
- Test cases and fixtures for every recipe before it touches production
- Workato On-Premise Agent for hybrid (on-prem + cloud) integration
- Event Streams and webhooks where polling is the wrong tool
- Enablement Labs clone-out discipline and a monthly changelog review cadence
HRIS synchronisation
Employee data flowing from the HR system into Docebo — joiners, movers and leavers — with the field mapping written down and the sync direction chosen on purpose.
What is in scope
- Workday (RaaS reports), SAP SuccessFactors, ADP Workforce Now, BambooHR, HiBob, Ceridian Dayforce
- Joiner–mover–leaver provisioning: branches, groups, managers, deactivation
- Field-mapping specification per system, including custom fields and external IDs
- Sync direction and cadence: scheduled vs event-driven, and what breaks in each
- Monthly reconciliation runbook and GDPR-aligned anonymisation of leavers
Identity & SSO
SAML 2.0 that survives the next certificate rotation and the next platform security change.
What is in scope
- SAML 2.0 with Okta and Microsoft Entra ID (Azure AD); OIDC where it fits
- Attribute mapping, just-in-time provisioning, single logout
- External IDs connector: one identity across HRIS, IdP and LMS
- Migration runbook for the 2026 security-standards cutover, tested in sandbox first
- Certificate and metadata lifecycle documented so it does not expire on demo day
Migration & deployment
Bulk loads and platform cutovers run through our own Docebo migration engine — 45 operations, each validated locally before a single row is written to the tenant.
What is in scope
- Users, branches, groups, power users and profiles
- Courses, catalogs, categories, learning plans, ILT sessions, training materials and SCORM
- Enrollments (create, update, archive), certifications and completions
- Two-phase model: check produces an errors file with zero tenant writes; execute pushes only the rows that passed
- CSV templates and a field-mapping engine so your export becomes the import
- Cutover plan, rollback points and a post-go-live reconciliation
What you get in every case
- A proposal with scope and exclusions before work starts — template.
- A project plan with phases, RACI matrix and risk register — template.
- Operating documentation: field mappings, runbooks and test cases, so your team maintains it without us.
- Optional ongoing support under an SLA with a quarterly review — SLA template, QBR template.
How we work
Six phases, each with a written exit criterion. The proposal, project plan, RACI and SLA we use are published as templates, so you can read the deliverables before you ask for a quote.
- 1
Discovery
Audit of the current platform, the systems it must talk to and the data in them. Stakeholders mapped, KPI baseline agreed.
Exit: Signed discovery report
- 2
Design
Integration architecture, field mappings, identity flow and the migration inventory — written down before anything is built.
Exit: Approved technical design document
- 3
Build
Recipes, connectors, SSO configuration and migration runs in sandbox, delivered in sprints you can see.
Exit: Working integration demonstrated on your tenant
- 4
Test
Test cases per recipe, migration check-phase reports, user acceptance with your admins.
Exit: UAT signed off, no open P1 issues
- 5
Deploy
Production cutover with rollback points, admin training, and a runbook your team can operate without us.
Exit: Live, with your IT team able to run it independently
- 6
Evolve
Optional ongoing support under an SLA, quarterly reviews, and changes as your HRIS or IdP changes.
Exit: Quarterly business review
Before kickoff: NDA and data-access agreement · Systems inventory and credentials handover · Named stakeholders on both sides · Kickoff with agreed success metrics.
Tell us what you are integrating or migrating
Send the platform, the systems involved and where you are stuck. You get a written scope back — phases, deliverables and what is out of scope — before anything is billed.